[PDF] Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications

ISBN: 1848210345

Category: Tutorial


Posted on 2017-12-28, by luongquocchinh.

Description



Author: Christian Artigues, Sophie Demassey | Category: Management | Language: English | Page: 288 | ISBN: 1848210345 | ISBN13: 9781848210349 |

Description: This title presents a large variety of models and algorithms dedicated to the resource–constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real–life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost–based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures.

DOWNLOADDownload this book
Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications.pdf
http://k2s.cc/file/8fdc01cc3ad2a/1848210345_project.pdf

Sponsored High Speed Downloads
5381 dl's @ 2867 KB/s
Download Now [Full Version]
5729 dl's @ 3101 KB/s
Download Link 1 - Fast Download
5012 dl's @ 3779 KB/s
Download Mirror - Direct Download



Search More...
[PDF] Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications

Search free ebooks in ebookee.com!


Links
Download this book

No active download links here?
Please check the description for download links if any or do a search to find alternative books.


Related Books

  1. Ebooks list page : 34801
  2. 2014-05-27Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications (Repost)
  3. 2013-08-25Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications (repost)
  4. 2010-09-01Resource-constrained Project Scheduling (Control Systems, Robotics, and Manufacturing
  5. 2010-04-30Resource-constrained Project Scheduling (Control Systems, Robotics, and Manufacturing)
  6. 2010-09-04Resource-constrained Project Scheduling
  7. 2019-01-11Constrained Clustering Advances in Algorithms, Theory, and Applications
  8. 2018-12-27Constrained Clustering Advances in Algorithms, Theory, and Applications
  9. 2018-01-06[PDF] Resource Management in Wireless Networking (Network Theory and Applications) - Removed
  10. 2017-12-12[PDF] Behavioral Social Choice: Probabilistic Models, Statistical Inference, and Applications
  11. 2017-02-09[PDF] Resource Management in Wireless Networking (Network Theory and Applications)
  12. 2012-04-27Constrained Clustering: Advances in Algorithms, Theory, and Applications
  13. 2012-04-22Constrained Clustering: Advances in Algorithms, Theory, and Applications [Repost]
  14. 2011-12-19Constrained Clustering: Advances in Algorithms, Theory, and Applications (Repost)
  15. 2011-06-28Wireless Algorithms, Systems, and Applications: First International Conference, WASA 2006, Xi'an, China, August 15-17, 2006, Proceedings (Lecture Notes in Computer Science)
  16. 2009-07-14Constrained Clustering: Advances in Algorithms, Theory, and Applications (repost)
  17. 2008-12-06Constrained Clustering: Advances in Algorithms, Theory, and Applications
  18. 2018-02-02[PDF] Twin Support Vector Machines: Models, Extensions and Applications (Studies in Computational Intelligence)
  19. 2018-01-30[PDF] Dynamics of Disasters_Key Concepts, Models, Algorithms, and Insights: Kalamata, Greece, June-July 2015 (Springer Proceedings in Mathematics & Statistics)
  20. 2018-01-28[PDF] Multivariate and Mixture Distribution Rasch Models: Extensions and Applications (Statistics for Social and Behavioral Sciences)

Comments

No comments for "[PDF] Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications".


    Add Your Comments
    1. Download links and password may be in the description section, read description carefully!
    2. Do a search to find mirrors if no download links or dead links.
    Back to Top