Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications (repost)

ISBN: 1848210345

Category: Technical

Tag: Science/Engineering


Posted on 2013-08-25. By anonymous.

Description


Christian Artigues, Sophie Demassey, "Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications"
2008 | ISBN-10: 1848210345 | 288 pages | PDF | 4,9 MB

This title presents a large variety of models and algorithms dedicated to the resource–constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real–life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost–based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures.

Sponsored High Speed Downloads
5025 dl's @ 2474 KB/s
Download Now [Full Version]
5400 dl's @ 3254 KB/s
Download Link 1 - Fast Download
5448 dl's @ 2430 KB/s
Download Mirror - Direct Download



Search More...
Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications (repost)

Search free ebooks in ebookee.com!


Links
Download this book

No active download links here?
Please check the description for download links if any or do a search to find alternative books.


Related Books

  1. Ebooks list page : 23048
  2. 2014-05-27Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications (Repost)
  3. 2017-12-28[PDF] Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications
  4. 2010-09-01Resource-constrained Project Scheduling (Control Systems, Robotics, and Manufacturing
  5. 2010-04-30Resource-constrained Project Scheduling (Control Systems, Robotics, and Manufacturing)
  6. 2012-04-22Constrained Clustering: Advances in Algorithms, Theory, and Applications [Repost]
  7. 2011-12-19Constrained Clustering: Advances in Algorithms, Theory, and Applications (Repost)
  8. 2009-07-14Constrained Clustering: Advances in Algorithms, Theory, and Applications (repost)
  9. 2011-06-28Wireless Algorithms, Systems, and Applications: First International Conference, WASA 2006, Xi'an, China, August 15-17, 2006, Proceedings (Lecture Notes in Computer Science)
  10. 2010-09-04Resource-constrained Project Scheduling
  11. 2019-01-11Constrained Clustering Advances in Algorithms, Theory, and Applications
  12. 2018-12-27Constrained Clustering Advances in Algorithms, Theory, and Applications
  13. 2012-04-27Constrained Clustering: Advances in Algorithms, Theory, and Applications
  14. 2010-10-10Multivariate and Mixture Distribution Rasch Models: Extensions and Applications (Repost)
  15. 2008-12-06Constrained Clustering: Advances in Algorithms, Theory, and Applications
  16. 2014-06-15Biologically-Inspired Optimisation Methods: Parallel Algorithms, Systems and Applications (repost)
  17. 2014-05-08Nodal Discontinuous Galerkin Methods: Algorithms, Analysis, and Applications [Repost]
  18. 2014-01-14Coding Theory: Algorithms, Architectures and Applications (repost)
  19. 2013-08-09Stochastic Algorithms: Foundations and Applications (repost) - Removed
  20. 2012-07-31SVD and Signal Processing, III: Algorithms, Architectures and Applications (Repost)

Comments

No comments for "Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications (repost)".


    Add Your Comments
    1. Download links and password may be in the description section, read description carefully!
    2. Do a search to find mirrors if no download links or dead links.
    Back to Top